Key points of construction
Home » News » Key points of construction

Key points of construction

Views: 0     Author: Site Editor     Publish Time: 2021-01-19      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Key points of construction

The base treatment is the key link to ensure the construction quality, and the most basic condition is to ensure that the wall is completely dry. Generally, it should be placed for more than 10 days. The wall surface must be smooth, and the putty shall be applied at least twice to meet the standard requirements.


The construction methods of latex paint brushing can be hand brushing, roll coating and spraying. Brush should be continuous and rapid operation, a brush.


When brushing emulsion paint, it should be uniform, and there should be no leakage, flow and adhesion. Brush once and polish once. Generally more than two times.


PRODUCTS

QUICK LINKS

Copyright     Nine Lotus  Co., Ltd
   +86-0511-85935888
   alinaypaintbrush@gmail.com